Potable Water Transmission
Baker City, Oregon
DETAILS
Owner
Baker City, Oregon
Constructed by
Baker City Public Works
Engineered by
Anderson Perry Engineers
Product
15,000’ – 24” x 14’ AWWA C900 DR25
2,500’ – 24” x 14’ AWWA C900 DR25