Airport Industrial Park Utility Extension
Prineville, Oregon
DETAILS
Constructed by
Taylor Northwest
Engineered by
Parametrix Engineers
Product
1,932’ – 21” ASTM F679 PS46
2,422 – 18” ASTM F679 PS46
5,500’ – 16” AWWA C900 DR18
3,180’ – 16” AWWA C900 DR14
3,960’ – 14” AWWA C900 DR18
12,020’ – 12’ AWWA C900 DR18
1,120’ – 12” AWWA C900 DR14
2,422 – 18” ASTM F679 PS46
5,500’ – 16” AWWA C900 DR18
3,180’ – 16” AWWA C900 DR14
3,960’ – 14” AWWA C900 DR18
12,020’ – 12’ AWWA C900 DR18
1,120’ – 12” AWWA C900 DR14